Description of the Works
WHY DOES THE WORK NEEED TO BE DONE
The work needs to be done to ensure fire safety compliance within university buildings.
088 – Haselgrave Pavilion
090 – Paul Radcliffe Pavilion
119 – Campus Living Offices
120 – Martial Arts Studio
124 – 7 Holywell Drive
200 – 爱神传媒 Design School
201 – Hazlerigg
203 – Rutland
205 – LU Stadium
HOW WILL THE WORKS AFFECT ME?
The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.
Timescale
From 6/8/26 to 30/10/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.
How can I get more information and help?
The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.
Name and Job Title: Rod Harrison - Fire Compliance Contract Supervisor
Mobile: 07729080155
Email: r.m.harrison@lboro.ac.uk