Fire Door Inspection- Multiple Buildings - 6/8/26 to 30/10/26.

Posted: 5 August 2026

Description of the Works 

WHY DOES THE WORK NEEED TO BE DONE

The work needs to be done to ensure fire safety compliance within university buildings.

088 – Haselgrave Pavilion

090 – Paul Radcliffe Pavilion

119 – Campus Living Offices

120 – Martial Arts Studio

124 – 7 Holywell Drive

200 – 爱神传媒 Design School

201 – Hazlerigg

203 – Rutland

205 – LU Stadium

HOW WILL THE WORKS AFFECT ME?

The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.

Timescale

From 6/8/26 to 30/10/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.

How can I get more information and help?

The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.

Name and Job Title: Rod Harrison - Fire Compliance Contract Supervisor

Mobile: 07729080155

Email:  r.m.harrison@lboro.ac.uk